{"id":3597,"date":"2017-08-25T22:41:13","date_gmt":"2017-08-25T21:41:13","guid":{"rendered":"http:\/\/wenvoe.org.uk\/?p=3597"},"modified":"2017-08-25T22:41:13","modified_gmt":"2017-08-25T21:41:13","slug":"new-library","status":"publish","type":"post","link":"http:\/\/wenvoe.org.uk\/?p=3597","title":{"rendered":"New Library"},"content":{"rendered":"<p>\n\t&nbsp;\n<\/p>\n<p>\n\t<span style=\"font-size:16px\">The Community Council do not hold a meeting during August.<\/span>\n<\/p>\n<p>\n\t<span style=\"font-size:16px\">The final detailed drawings for the new library are available to be viewed at the Community Centre and the library, your comments are welcomed before planning permission is sought. The building will be internally connected with the present building and also include new toilets. The car parking area will be where the present library building stands and a children&rsquo;s recreation area will be set aside on the south side of the building along with a storage building for the groups who use the Community Centre.<\/span>\n<\/p>\n<p>\n\t<img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"233\" data-attachment-id=\"3599\" data-permalink=\"http:\/\/wenvoe.org.uk\/?attachment_id=3599\" data-orig-file=\"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2017\/08\/library.jpg?fit=500%2C233\" data-orig-size=\"500,233\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"library\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2017\/08\/library.jpg?fit=300%2C140\" data-large-file=\"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2017\/08\/library.jpg?fit=500%2C233\" alt=\"\" class=\"aligncenter size-full wp-image-3599\" src=\"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2017\/08\/library.jpg?resize=500%2C233\" style=\"height:233px; width:500px\" srcset=\"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2017\/08\/library.jpg?w=500 500w, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2017\/08\/library.jpg?resize=300%2C140 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" data-recalc-dims=\"1\" \/>\n<\/p>\n<p>\n\t<span style=\"font-size:16px\">The present wooden library building was originally a &lsquo;temporary&rsquo; school classroom in the early 1970s and is now well past its normal life span. To finance this construction the Council are seeking a substantial grant with the balance coming from section 106 monies<\/span>\n<\/p>\n<p>\n\t<span style=\"font-size:16px\">Section 106 Agreements are legal agreements between the Local Authority and a developer; and are linked to planning permissions. These agreements are drafted when it is considered that a development will have significant impact on the local area that cannot be moderated by conditions attached to a planning decision. The aim is to balance the pressures created by a new development with improvements to the surrounding area ensuring that where possible the development would make a positive contribution to the local area and community. These can include highways, education, open spaces, affordable housing, and other local capital projects. Often these contributions are made in stages as the development progresses.<\/span>\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<p>\n\t&nbsp;\n<\/p>\n<hr \/>\n<hr \/>\n<p>\n\t&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; The Community Council do not hold a meeting during August. The final detailed drawings for the new library are available to be viewed at the Community Centre and the library, your comments are welcomed before planning permission is sought. The building will be internally connected with the present building and also include new toilets. The car parking area will [&#8230;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[12],"tags":[],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p6cWjO-W1","jetpack-related-posts":[{"id":10539,"url":"http:\/\/wenvoe.org.uk\/?p=10539","url_meta":{"origin":3597,"position":0},"title":"New Library Opens Its Doors","author":"Alan Williams","date":"17th November 2021","format":false,"excerpt":"WENVOE COMMUNITY LIBRARY For general enquiries you can email us at wenvoelibrary@outlook.com ANOTHER WENVOE LANDMARK EVENT: NEW COMMUNITY LIBRARY HUB\u00a0OPENS ITS DOORS IN NOVEMBER If you fancy some good reads as we head towards winter, a cup of coffee and a chat in the centre of the village, and a\u2026","rel":"","context":"In &quot;General Interest Articles&quot;","block_context":{"text":"General Interest Articles","link":"http:\/\/wenvoe.org.uk\/?cat=334"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2021\/11\/Picture1.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2021\/11\/Picture1.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2021\/11\/Picture1.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2021\/11\/Picture1.jpg?resize=700%2C400 2x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2021\/11\/Picture1.jpg?resize=1050%2C600 3x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2021\/11\/Picture1.jpg?resize=1400%2C800 4x"},"classes":[]},{"id":8478,"url":"http:\/\/wenvoe.org.uk\/?p=8478","url_meta":{"origin":3597,"position":1},"title":"Planning Applications","author":"Alan Williams","date":"30th October 2020","format":false,"excerpt":"The Council conducted their monthly meeting using Zoom due to Covid restrictions. Planning Applications \u2022 Wenvoe Library, Old Port Road. Work to Trees in Wenvoe Conservation Area: Field Maple - To remove one multi stem tree (1) as it is dangerous and to reduce recrown of the other (2) by\u2026","rel":"","context":"In &quot;Planning Applications&quot;","block_context":{"text":"Planning Applications","link":"http:\/\/wenvoe.org.uk\/?cat=151"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/10\/library.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/10\/library.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/10\/library.jpg?resize=525%2C300 1.5x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/10\/library.jpg?resize=700%2C400 2x"},"classes":[]},{"id":10092,"url":"http:\/\/wenvoe.org.uk\/?p=10092","url_meta":{"origin":3597,"position":2},"title":"General News","author":"Alan Williams","date":"23rd August 2021","format":false,"excerpt":"General News New Library Building (Editors Note:\u00a0 This article was written before construction was delayed because of unforeseen problems with\u00a0 asbestos. The start date will be delayed ) Construction work on the new library will commence on Monday 16th August with the demolition of the old building and construction of\u2026","rel":"","context":"In &quot;Community Council News&quot;","block_context":{"text":"Community Council News","link":"http:\/\/wenvoe.org.uk\/?cat=12"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":8189,"url":"http:\/\/wenvoe.org.uk\/?p=8189","url_meta":{"origin":3597,"position":3},"title":"New Library &#8211; Latest","author":"Alan Williams","date":"3rd September 2020","format":false,"excerpt":"New Library - Latest Library - We now have a quotation for replacement of the library building with a modular \u201cdemountable\u201d unit. The advantage of this type of building is that on-site installation time is considerably less than for a conventional building, which will minimise disruption to operation of the\u2026","rel":"","context":"In &quot;Community Council News&quot;","block_context":{"text":"Community Council News","link":"http:\/\/wenvoe.org.uk\/?cat=12"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/09\/libary.jpg?resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/09\/libary.jpg?resize=350%2C200 1x, https:\/\/i0.wp.com\/wenvoe.org.uk\/wp-content\/uploads\/2020\/09\/libary.jpg?resize=525%2C300 1.5x"},"classes":[]},{"id":11495,"url":"http:\/\/wenvoe.org.uk\/?p=11495","url_meta":{"origin":3597,"position":4},"title":"Planning Updates May 2022","author":"Alan Williams","date":"2nd May 2022","format":false,"excerpt":"Planning Updates May 2022 .Planning Updates The following applications have been approved Glenburnie, Port Road Development of a Care Home and associated works, Discharge of Condition 3 (Materials Details). 60, Burdons Close. Work to Tree(s) covered by Tree Preservation Order Cae Hafan Fields, Adjacent to A4050, Wenvoe. A planning application\u2026","rel":"","context":"In &quot;Planning Updates&quot;","block_context":{"text":"Planning Updates","link":"http:\/\/wenvoe.org.uk\/?cat=152"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6236,"url":"http:\/\/wenvoe.org.uk\/?p=6236","url_meta":{"origin":3597,"position":5},"title":"Three Year Report","author":"Alan Williams","date":"30th July 2019","format":false,"excerpt":"A Report After Three Years Background Your Community Library took over providing the library service in September 2016 and this is a review of the present position. Volunteers are the backbone of the service. They work in pairs to open the library; the detailed opening hours are on the inside\u2026","rel":"","context":"In &quot;Wenvoe Community Hub&quot;","block_context":{"text":"Wenvoe Community Hub","link":"http:\/\/wenvoe.org.uk\/?cat=9"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3597"}],"collection":[{"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3597"}],"version-history":[{"count":2,"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3597\/revisions"}],"predecessor-version":[{"id":3600,"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/3597\/revisions\/3600"}],"wp:attachment":[{"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3597"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/wenvoe.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}